11.1 min scaled 1

City Tower Saburtalo

Project: Commercial Office Spaces on Floors 2-16
Works Performed by MepSolution:

• Projecting
• Cabling and Installation of Cable Constructions
• Installation of Electrical Distribution Shields
• Fourniture Installation
• Lighting Installation
• Evacuation Lighting Installation
• Installation of Fire Alarm System
• Fire Alarm installation
• Installation of Water Fire Extinguishing System
• Heating and Cooling System Installation
• Installation of Ventilation System
• Weak Power Works

Periodicity of Works: Step by Step

Status: Completed

Client: IG Development Georgia LLC

Location: Tbilisi, Vazha Pshavela St. #70

Period: 2021 – 2023